|
|
|
|
Welcome to the Website of |
|
|
|
|
|
A.C.A. Howe International Limited |
|
|
Geological and Mining Consultants |
|
|
|
|
|
Coalbed Methane
Natural gas may be produced from wells in deep coal seams by pumping out water to reduce formation pressure. In the early 1990s in the USA there were about 6,000 coalbed methane (CBM) wells producing over a billion cubic feet per day, and CBM reserves represent a significant proportion of total onshore gas. The technology is now being disseminated worldwide. A C A Howe International Ltd have been involved in coal exploration, geology, reserves estimation, feasibility studies and mine planning in Indonesia, Venezuela, Australia and the UK since early 1980's and in coal bed methane projects in the UK and Poland since 1990. We are closely involved with all aspects of the first technically successful coal bed methane project in Scotland and possibly the UK, from 1990 through to the drilling, stimulation and production from the first well in 1993, as follows:
|
Familiarisation with the developing industry in the USA through visits to drilling, stimulation and production operations and conferences, courses and meetings in Alabama, Wyoming, Colorado and Nova Scotia
|
|
Geological research, selection and negotiation of two hydrocarbons exploration licences for coalbed methane extending to 886 square kilometres in Scotland
|
|
Negotiations and liaison with landowners, coal, gas and oil companies and planning authorities regarding access to land, minerals and data
|
|
Detailed studies of seismic and borehole interpreted structure, stratigraphy, coal geotechnical data and mine abandonment records to select optimum sites for test wells
|
|
Geological prognoses for the first five wells
|
|
The first successful completion of an air-foam flush hydrocarbon well in the UK
|
|
Extensive enquiries to well service companies regarding hydraulic fracture stimulation techniques and costs
|
|
Well site geology including core logging, canister desorption tests, gas analyses, wireline logging and interpretation
|
|
Interpretation of results from the first well to estimate gas in place, and for the design of nitrogen foam-sand and water-sand hydraulic fracture stimulations
|
|
Successful water-sand hydraulic fracture stimulation
|
|
Data compilation, rehabilitation and project review
|
|
Production testing
|
|
|
| |
|
|
| |
Copyright
1998-2003, A.C.A. Howe International Limited
A.C.A. Howe International Limited.
254 High Street, Berkhamsted, Hertfordshire. HP4 1AQ. UK
Telephone: +44 (0) 1442 873398
Fax: +44 (0) 1442 865710
Email: reception@acahowe.co.uk
|
|
|